Page 193 - B6118-AEW-XX-XX-PP-A-0001_(P19)_Contractors Manual
P. 193

DESIGN























                     3 General Principles                        The general principles detailed below must be applied to ALL
                                                                 projects i.e. New Builds, Re-Images.





                                           Principal             Theory
                                           PEST PROOF            Measures must be carried out during the construction or
                                                                 refurbishment of a restaurant, as after this parts of the
                                                                 building become inaccessible.  On existing restaurants
                                                                 proofing and preventative works should be carried out on an
                                                                 ongoing basis to reduce the risk of infestation occurring.
                                           GAPS                  The standard is to have no gaps, holes etc. in walls, etc.,
                                                                 unless for proper building construction reasons.  References
                                                                 to maximum gaps apply only where a gap is needed, for
                                                                 instance to allow a door to open etc.
                                           FILLERS               Cement mortars, epoxy mortars, and other solid fillers
                                                                 should always be the first option.  The use of foam fillers
                                                                 should be avoided as far as possible as it wears over time
                                                                 and can be easily gnawed by rodents.
                                           BRISTLE STRIPS        The use of bristle strips, rubber strips etc. should only be a
                                                                 last resort measure as they wear quickly.  Sound
                       General Notes                           construction methods should render their use unnecessary.


                                           REFURBISHMENT         Buildings to be left in a pest proof condition at end of each
                                           ACTIVITIES            working day.  No food scraps to be left on site.  Any food
                                                                 waste placed in lidded containers and removed from site
                                           ELECTRIC FLY KILLERS   Minimum of one EFK fitted as follows:  Within the kitchen
                                           (EFK)                 area within view of the dressings table.

                                                                      Not above food preparation or storage surfaces /
                                                                       areas
                                                                      Not directly opposite openable windows and doors.

                                                                 NB – the EFK can be within customer view if necessary for
                                                                 most effective siting.
                                           COMMUNICATION         Any pest sightings to be reported to PM, Pest Company and
                                                                 Operations Team immediately to ensure suitable support
                                                                 received prior to restaurant open.








          D7.9           Pest Control Standards               1.0                        02 November 2016
                                                              5
   188   189   190   191   192   193   194   195   196   197   198