Page 294 - B6118-AEW-XX-XX-PP-A-0001_(P19)_Contractors Manual
P. 294
CONSTRUCT
C1 Shopfront and BWIC
C1.5 DT Signage Studs
Where new signage is proposed to drive thru Where no existing studs can be reused, new
buildings, roof studs will invariably require signage studs must be procured as one of
alterations to accommodate. the standard engineer details attached and
appropriately fixed to the roof structure. The
The existing roof finish must be carefully stripped attached is a typical drawing for a standard
back locally to allow stud fixing and allow new Britspace / Yorkon modular building. For other
signage electrical supplies to be pulled into variations the principal contractor must adapt
position. The new / reused signage studs must this detail to suit. Any further design work required
be fixed as one of the standard engineer details for site specific details will be undertaken by the
attached and the roof weathered locally back principal contractor. All new exposed steelwork
to the roof finish. must be constructed with a galvanised finish.
Any mild steel (only acceptable below roof
finish line) must be finished with min 2No coats
red oxide paint finish.
Once the studs are correctly located and fixed
into position, the existing roof finish must be
reinstated around the studs and adequately
weathered. Signage stud location to be
coordinated with signage supplier.
C1.5 DT Signage Studs 1.0 08 October 2014