Page 295 - B6118-AEW-XX-XX-PP-A-0001_(P19)_Contractors Manual
P. 295

CONSTRUCT













          C1.6 DT Booth

          Drive thru  booth  window replacement now             The open aperture must then be closed off in
          forms part of the Experience of the Future scope      a fully watertight manner finished internally and
          of  works;  mandatory  for  McOpCo  restaurants,      externally to match the existing surrounding
          recommended for Franchised restaurants.               finishes  including  the  line  on  which  they  sit.
          Replacement booth windows must:                       Generally, the external finish will be brick slip or
          -  Be solid from floor level to cill level by utilising   render for which the principal contractor must
            an insulated spandrel panel                         achieve an adequate match through  their
          -  Be glazed from cill level to 250mm below soffit    own procurement channels. This external finish
            level                                               should be applied onto a rigid insulation board.
          - Be glazed for  the  full width of  the  booth  as   The insulation board must be tightly butt jointed
            identified on the site specific drawings            to the existing surrounding insulation board and
          -  Be glazed the full extent of any returns / sides   sealed between  using  and  expanding  foam
            to the booth as identified on the site specific     filler  or  a  compressible  foam  joint.  Generally,
            drawings                                            most brick slips have previously been supplied
          - Contain  a sliding service window to  allow         to  McDonald’s by Euro-brick, contact  details:
            customer / crew interaction                         01179  717  117,  web  site  www.eurobrick.co.uk
                                                                although  alternative suppliers are equally
          Booth windows must be provided by the use of          acceptable.
          PPC alu shopfront framing as described under
          the shopfront section. New booths must also be        The rigid insulation board must be fully bonded
          fitted with                                           and mechanically fixed to a 18mm WBP plywood
                                                                backing board supported on  a metsec  metal
          - Over window heaters, refer  to services             stud frame system tied into the  existing walls.
            specifications                                      Internally, the metal stud should be finished with
          -  New ceiling                                        a 12mm plywood and either a hygienic wall
          -  New lighting                                       system  finish  or  a  further  9.5mm  plasterboard
                                                                layer to which ceramic tiles can be applied.
          Any  existing booth  windows which are  being
          removed or repositioned must be completed by          Any replacement or remedial works to existing
          the principal contractor. In such circumstances,      booths with timber effect or grey cladding must
          the existing (serv-o-slide) window must be            be undertaken by Butterfield Signs.
          carefully removed and disposed of as instructed
          by the project manager (usually stored for future
          use).
















          C1.6           DT Booths                           4.0                        25 July 2017
   290   291   292   293   294   295   296   297   298   299   300