Page 300 - B6118-AEW-XX-XX-PP-A-0001_(P19)_Contractors Manual
P. 300

CONSTRUCT





       C2 External Works






       C2.1 Ducts and Draw Pits

       New ducts installed must be provided by 100mm
       dia  UPVC  flexiduct  laid  min  cover  -300mm,
       more typically -600mm below local finish level;
       final depths to be designed by contractor to suit
       site ground  conditions. Straight ducts must be
       retained in place with concrete  haunches at
       min 1200mm centres. Any bends within the duct
       to be fully set in concrete and must be formed
       in propriety 100mm dia swept bends (not tight
       90 degrees).


       Proprietary  draw pits  should be installed  as
       required where numerous ducts congregate
       for pulling into the building or further around the
       site. Duct chambers to be 600x600mm footprint
       with proprietary flush metal cover plates.


       All ducts to be laid with draw wires ready for
       pulling of electrical cables.

       All installed ducts should be sealed at each
       end on completion using wire mesh (max 10mm
       gaps) set in expanding foam, min 100 deep.



































        C2.1           Ducts and Draw Pits                  1.0                       08 October 2014