         C3.6 Wall Graphics

         Where  noted  on  the  architect’s drawings,           For natural integrity projects, walls must be lined
         graphics will be supplied and fitted by a named        with MR MDF to achieve a flush line of finishes
         specialist. During the detailed design phase, the      between wall graphics and tiles below.
         named graphic supplier should attend site with
         the principal contractor to assess the condition       The  graphic  media is digitally printed  wall
         of all existing walls and to advise on any require     vinyl which is installed as any other  wall vinyl.
         preparatory works from the following measures:         Wall  ‘sizing’  or  sealing  as  graphics  supplier
                                                                recommendations.
         •  Retain  existing  wall  finish  ready  to  receive   Whilst installing the wall graphics to the dining
             new wall vinyl directly.                           area and staff room  walls,  the  nominated
         •  Remove  part  existing  finishes  and  patch        graphics company will also install a transfer that
             repair ready to receive new wall vinyl.            reads ‘crew information’ to the white laminated
         •  Remove all existing finishes and provide new        wall in the staff area.
             substrate (MDF or plasterboard)  ready to
             receive new vinyl.

















































          C3.6           Wall Graphics                        2.0                        23 June 2016