Page 15 - B8773-AEW-XX-XX-PP-A-0003_[P9]_Franchisee Toolkit_Neat
P. 15

DPG PM / Acquisitions Surveyor  Franchisee  Principal Designer  Principal Contractor
         (As defined under the CDM Regulations 2015)

 Co ordinate diaries, organise PSM and   Comply with all duties as ‘Client’ under the   Attendance at pre-start meeting  Confirm contract costs and construction   Pre-start Anchor Meeting
 arrange access via Landlords / agents /   CDM Regulations 2015:  programme, including key dates and critical
 other.  Provide a pre start meeting report on H&S   path
 Ensure that a PD is appointed  Issues identified within the pre construction
         phase                                Review the Construction Phase Health
 Agreement of payment terms to be recorded  Ensure that a PC is appointed  & Safety Plan. Review Design Hazard
 within meeting minutes. Recommended %   Liaise with the Principal Contractor  Identification notes / risk register as required.
 split of staged payments as follows:  Ensure that appropriate time and resources
 are allocated - any accidents or breaches of   Review information on design changes  Where applicable, confirm receipt of
 - 40% on commencement  Health and Safety good practice due to lack   asbestos survey report and status of any
 - 40% on completion  of time or inadequate funding of appropriate   planned or completed asbestos removal
 - 20% on final account*  safety measures may be deemed as the   works.
 Clients fault by the HSE. Franchisees are
 (2.5% retention to be held for six months post   advised to act responsibly regarding project   Discuss and agree payment terms with the
 completion)  programmes and budgets.         franchisee, including % split and timing of
                                              staged payments.
 Ensure that welfare facilities are provided
 - franchisees may expect the Principal
 Contractor to provide welfare facilities during
 the site period. However, it is the franchisee’s
 responsibility as ‘Client’ to ensure that these
 facilities are provided.
 Ensure that the Principal Contractor is sharing
 appropriate information with the design team
 and carrying out their coordination duties.
 Appoint a PC
 Discuss and agree payment terms with the
 Principal Contractor, including % split and
 timing of staged payments.
 Provide attendance for site surveys / meter   Review the Construction Phase Plan and   Place orders including domestic sub
 installations of all utilities.  comment on its suitability to the Client - If   contractors  Mobilisation
         the Plan is deemed not sufficient advise that
 Take meter readings for all utilities supplies   works should not start.  Maintain minimum cover of £5m Public
 (gas, water and electricity) to help prevent   Liability Insurance and ensure the same for all
 incorrect charges for usage prior to taking   Liaise with the PC to develop a  Suitable plan  sub-contractors / direct suppliers
 possession of the site.
                                              Arrange for provision of welfare facilities
 Pass all meter readings to DPG Project       on behalf of the franchisee as required
 Manager so they can be logged at the         under CDM Regulations 2015. Guidance on
 time of Change of Tenancy (COT). NB: DPG     appropriate levels can be found on the HSE
 will not accept responsibility for any utility   website
 usage costs for the period after the Change
 of Tenancy, when the franchisee takes        Develop the Construction Phase Health &
 occupation.                                  Safety plan to an acceptable standard to
                                              allow  works to start on site.
 Place any direct orders with suppliers. Check
 all drawings and documents prior to placing
 orders for equipment. (DPG will not accept
 responsibility for any errors made)
 Ensure that a suitable asbestos survey report
 has been obtained / instructed and made
 available to the Principal Contractor. DPG
 recommend that all asbestos is removed from
 demised areas.

 Provide information to the PC to allow
 adequate planning, management and co-
 ordination of the construction phase
 Ensure appropriate contents insurance cover
 is in place
 Ensure plans for welfare facilities to be put in
 place prior to start on site.









                                                                                                               15
   10   11   12   13   14   15   16   17   18   19   20