Page 465 - B6118-AEW-XX-XX-PP-A-0001_(P15)_Contractors Manual_Neat
P. 465

CONSTRUCT


















          C3.21 Counter Ceiling Raft; New

          Where existing MDF counter rafts are not present      The new raft should project 50mm below the
          a new raft should be provided to the details set      dining  area  ceiling  line  unless  specifically  set
          out below.                                            out on the site specific architects drawings. The
                                                                new raft should be solid for the full width and
                                                                depth of the counter opening. The raft should
                                                                be decorated white throughout.




























































          C3.21          Counter Ceiling Raft; New            3.0                        23 June 2016
   460   461   462   463   464   465   466   467   468   469   470