2.9.3 ‘Make line’ and Slap Table Monitor Shrouds
Where the slap table/make line backs onto a Where the slap table/make line doesn’t back
wall, the three wall mounted monitors must be onto a wall, i.e. a sneeze screen, the monitors
shrouded by black monitor shrouds. Additional should be pole mounted from the ceiling.
monitors may also be required - refer to drawings.
• The surrounds require installation by the main
contractor. The monitors, brackets, small
power and data points must be installed in
the usual manner, concealed by the shroud
• Sockets, data points, monitor brackets and
the black shroud should be fitted by the
shopfitter BEFORE the computer installation
team arrive
• The tiles inside the shroud should be covered
by BLACK vinyl by the sign contractor.
• ALL sockets and data points inside the
shroud should be BLACK
• There are also angled front faced shrouds,
so angled monitors sit confortably
• The boxes will have two sets of fixing holes to
ensure left and right-handed mounting, so
there is no need to order anything bespoke
Be aware that:
a) the makeline monitor should face towards
the counter
b) the monitor at the makeline - slap table
junction should face away from the makeline
c) the monitor near the front of the slap table
should face towards the makeline