       2.9.3 ‘Make line’ and Slap Table Monitor Shrouds
       Where the slap table/make line backs onto a           Where  the  slap  table/make  line  doesn’t  back
       wall, the three wall mounted monitors must be         onto a wall, i.e. a sneeze screen, the monitors
       shrouded by black monitor shrouds. Additional         should be pole mounted from the ceiling.
       monitors may also be required - refer to drawings.
       •  The surrounds require installation by the main
          contractor.  The  monitors, brackets, small
          power and data points must be installed in
          the usual manner, concealed by the shroud
       •  Sockets, data points, monitor brackets and
          the  black  shroud  should  be  fitted  by  the
          shopfitter  BEFORE  the  computer  installation
          team arrive
       •  The tiles inside the shroud should be covered
          by BLACK vinyl by the sign contractor.
       •  ALL  sockets  and data points inside the
          shroud should be BLACK
       •  There are also angled front faced shrouds,
          so angled monitors sit confortably
       •  The boxes will have two sets of fixing holes to
          ensure  left  and  right-handed  mounting,  so
          there is no need to order anything bespoke


       Be aware that:
       a)  the  makeline  monitor  should  face  towards
       the counter
       b)  the  monitor  at  the  makeline  -  slap  table
       junction should face away from the makeline
       c) the monitor near the front of the slap table
       should face towards the makeline