Page 209 - Installation Training Binder FIT1-3
P. 209

Thermal Bonding the Liner (continued)










 2. Prepare for Bonding
 •  Clean working area

 •  No debris between parts being bond

 •  Clean nozzle

 •  Preheat thermal bonding unit to 525° F
 •  Allow 10 minutes for thermal bonding unit to stabilize to

 temperature










 CAUTION: Be mindful of the
 positioning of the thermal

 bonding unit at all times.
   204   205   206   207   208   209   210   211   212   213   214