Page 416 - Installation Training Binder FIT1-3
P. 416

Setup Instruction for Retrofit Installation

                   A “Retrofit” is defined by EnviroGuard as a spill containment installation
                   where the battery rack has been installed.

                   Tools Required for Installation

                       •  Anchor Setting tool (Provided)
                       •  Caulking Gun (Provided)
                       • Chalk Line
                       • Duct Tape
                       •  Double Stick Tape
                       •  Utility Knife with Regular or Hook Blades
                       •  Side Cutters (Snips)
                       •  Throw-away Latex Gloves
                       •  T-Square or Straight Edge (at least 4” long and preferably non-metallic)
                       •  Measuring Tape (non-metallic)
                       • Marking Pen
                       •  Thermal Bonding Tool Kit W/ Approved Heat Gun (Figures 1, 2 and 3)











                            Figure 1                          Figure 2                       Figure 3

                   A. Site Survey
                       1.  Check for Obstructions (Figure 4)

















                                                          Figure 4













                   EnviroGuard  800-206-9884     Fax  909-624-1772                     www.egsintl.com

                   10/08 rev. A         Hawk System Retrofit Installation Setup Instruction          - 3 -
   411   412   413   414   415   416   417   418   419   420   421