Page 418 - Installation Training Binder FIT1-3
P. 418

5.  Pull liner into clear and clean workspace
                       6.  Lay liner flat and remove all wrinkles
                       7.  Measure width of stanchions
                       8.  Note any inconsistency between stanchions
                          ƒ Parallel
                          ƒ Exact measurement
                       9.  Extend stanchion lines entire width of liner (Figure 10)
                       10. Repeat for all stanchions
                       11. Verify lines are parallel (Figure 11)









                                        Figure 10                             Figure 11

                       12. Measure width of liner
                       13. Strike centerline half the width on liner (Figure 12)
                       14. Measure and transfer to liner
                          ƒ Jogs
                          ƒ Abutments
                          ƒ Obstructions
                       15. Measure length of stanchions
                       16. Mark each side of liner half the length from the centerline (Figure 13)











                                           Figure 12                             Figure 13




                   EnviroGuard  800-206-9884     Fax  909-624-1772                     www.egsintl.com

                   10/08 rev. A         Hawk System Retrofit Installation Setup Instruction          - 5 -
   413   414   415   416   417   418   419   420   421   422   423