Page 14 - In The Loop Feb-Apr 2018
P. 14
Up & Running - Plant 4
Aerial View of Plant 4
In line with Company’s Vision 2020, Interloop Limited Plant Machines.
4 is a step towards improving processes and becoming
robust in operations. The Plant is designed to reduce Work in Process (WIP), to
control MUDA; a Lean concept in Toyota Production
The new vertically integrated manufacturing facility has System (TPS) that focuses on eliminating waste by
been planned on Lean based operating procedures; shaping an efficient assembly line, allocating resources
equipped with 736 state of the art Knitting Machines, effectively, improving productivity and being cost effective.
e-Flow Washing Technology and Latest Boarding
State of the art Italian Knitting Machines with the capacity to produce 6.4 million pair of socks monthly
e-Flow Washing Technology at Plant 4
14