   PROJECT DEVELOPMENT AND SERVICES 7.6 Governance Approach (continued) Design Process (continued) Design Documentation (continued) • Detailed and dimensioned plans and elevations of existing and proposed conditions (GA Plans, Furniture plans, Partition plans, RCP, Joinery plans, Demolition plans, etc.) • Specifications for all disciplines • Elevations and sections as required • Door and hardware schedules • Furniture, workstations • Equipment schedule • Services equipment schedules • Signage schedules. • Present detailed design for client approval. • Attend weekly design meetings (combination of onsite & teleconference. Tendering & Procurement • In accordance with the contracting requirements, produce tender design documentation, including specifications and schedules, to enable the tendering of trade packages. • Provide assistance as required during the trade package tendering and evaluation periods. Respond to any technical queries during the tender process. Construction Phase • Update the Detailed Design • Documentation into a full suite of ‘For Construction’ documentation, making any amendments as required by the tender process. • Provide written, clear, unambiguous responses to site queries (RFIs). • Inspect and provide list(s) of outstanding defects and omissions prior to Practical Completion. • Assess completion of work in accordance with the design and certify Practical Completion for architectural elements. Post Construction • • Inspect and list remaining outstanding defects identified at Practical Completion until closed out. Assess, revise and submit asbuilt documents within two weeks of Practical Completion.   40                          


































































































   38   39   40   41   42