Page 277 - (KU)01-75GAJ-1.5 - Change 1
P. 277
INTRO
EP'S (KU)01-75GAJ-1.5 FIGURES
O
Q2 IS THE HOSE GOING TO BE GUILLOTINED? ACAWS
NO
GROUND
NOTE
Q3
The hose guillotine system uses a guillotine TAKEOFF
like blade driven by an explosive CAD to
allow the extended segment of hose and
drogue to be severed from the pod and fall FIRE/SMK
NORM free.
J. Hose Guillotine procedure....................... Accomplish
PRES/OXY
K. Land..................................As soon as practicable (P)
(End of Procedure) ENG/PROP
Q3 IS THE CMDS NEEDED? FUEL
NO AAR
L. CMDS OVRD AR POD LSK (POD CONTROL PAGE
M 3/3)..............................................................Select (CC/CM)
SPEC NOT FOR FLIGHT ELEC
M. Landing with Trailing Hose procedure...............Accomplish (P)
HYD
N. Land...................................................As soon as practicable (P)
(End of Procedure) FLT CTRL
O. Hose condition (affected pod)........Report damaged hose (CC/LM/CM)
GEAR
Q4
IS HOSE STABLE?
DOR/RMP
NO
PERF Q5
S IS HOSE USABLE? JETTISON
NO
P. Use................................................... As required
LANDING
(End of Procedure)
R. Hose....................................................... RWND (CC/CM) DITCHING
(End of Procedure)
S. Unstable Hose procedure............................................... Accomplish BAILOUT
(End of Procedure)
OPER FAULT LG
Use, copying and/or disclosure is 1 -239
governed by the statement on the
title page of this document. BACK CHARTS