S2CP was renewed with minor maintenance process of mostly repainting jobs, vandalized
structure rectification and crack rectification (refer figure 3.2). Based on the findings from S2CP plan
evaluation, the CFFC involved were the maintenance works such as man power to execute paint jobs
and rectification works. This research will focus on one key indicator which is the hard landscape or
man-made elements which involved modification. The soft landscape or natural elements
modification will not be taken into consideration due to once the vegetation are matured they
served as carbon sequester. Based on the plan evaluation, S2CP design characteristics did not have
fields to be maintained. The park has only grass area that needed low mowing activity. The grass
area is only be trimmed once the turf overgrown over a foot. This will lead to low frequency of
mowing the grass and cause lower carbon footprint. Based on discreet observation, PPN has fewer
visitors compared to S2CP. It is due to the activities offered differently in each green space. In order
for a green space to be attractive signature activities should be imposed in a green space.
Legend:
Existing green space build up
Renewed green space
Fig. 3.2: As built plan evaluation of Seremban 2 City Park
The findings derived from both plan evaluations are vibrant activities can generate positive
social attributes among users. Well-equipped facilities affirm the green space physical attributes