Page 7 - Hive 28 March 2019
P. 7

EXCELLENCE THROUGH OUR PEOPLE, PROCESS AND PERFORMANCE


 LORNE STEWART
 ENGINEERING LEIGH
 Lightbox D1, a 19-storey,
 238 apartment block located
 within MediaCityUK at
 Salford Quays is due
 for completion in
 October 2019.
                          LORNE STEWART           LORNE STEWART                 LORNE STEWART
                          FACILITIES LONDON       ENGINEERING PLYMOUTH          ENGINEERING LONDON
                          continue to support Bupa   successfully completed the   prepare to start the MEP installation
                          Cromwell, one of the most   Sherwell Centre at Plymouth   at 1 Palace Street, a spectacular
                          internationally renowned   University in October 2018.  Grade II listed residential
                          private hospitals in London’s                         development opposite Buckingham
                          Kensington and Chelsea.                               Palace and the Queen’s Gallery.
























                                                                                                                     5







































       LORNE STEWART                  LORNE STEWART              LORNE STEWART             LORNE STEWART
       ENGINEERING WYNYARD            ENGINEERING COLCHESTER     ENGINEERING CARDIFF       ENGINEERING SOUTHAMPTON
       Mount Oswald Student Village at   Brentwood Town Hall, Essex marks   continue their partnership with   due to complete the refurbishment
       Durham University is the latest project   the beginning of a great relationship   Aston Martin Lagonda with   of Capstan House, a nine-storey
       secured with Interserve as part of an   with Farran Construction.  imminent new contracts.  office development in East India
       ever developing relationship with                                                   Dock London in Spring 2019.
       Lorne Stewart Wynyard.
   2   3   4   5   6   7   8   9   10   11   12