                                     •   Provide preliminary mechanical system space requirements for hotel and
                                         amenity spaces.
                                     •   Submission for budget confirmation for MEP/FP systems.
                                     •   Attendance at the allocated project meetings during this phase.
                                     •   Participation in value engineering effort if MEP/FP construction costs exceed
                                         project budget.



                   TASK          CONSTRUCTION DOCUMENT / PERMIT

                      03             •   Incorporation of client, construction manager, and design assist team input
                                         from design development effort.
                                     •   Final architectural coordination.
                                     •   Documentation of the systems suitable for bidding and permit
                                             o  Completion of the remainder of the typical enlarged unit and
                                                 guestroom mechanical, electrical and plumbing plans for
                                                 bid/construction based on owner/architect input
                                             o  Final equipment, distribution and terminal device sizing
                                             o  Completion of design of commercial, hotel, common area, amenity,
                                                 courtyard and parking garage systems.
                                             o  Completion of specification
                                     •   Attendance at the allocated meetings during this phase.
                                     •   Issuance of permit and construction MEP/FP packages, including
                                         COMcheck compliance forms.




                   TASK          GC BIDDING

                      04                     o  Attend pre-bid meetings
                                             o  Analyze proposed alternatives and substitutions
                                             o  Attendance at allocated meetings during this phase.



                   TASK          CONSTRUCTION ADMINISTRATION


                      05             •   Attendance at the allocated site observation inspections
                                     •   Respond to reviewing agencies.
                                     •   Response to contractor RFIs.
                                     •   Review of shop drawings.
                                     •   Preparation of a single punch list effort for the following areas:
                                             o  One of each apartment configuration (i.e. one bedroom, one
                                                 bedroom with den, two-bedroom, two bedroom with den, studio,


         Advanced Engineering Inc. | 5561 Pennell Road, Media PA 19063 | 610-361-0700                   10/21
   119   120   121   122   123   124   125   126   127   128   129