Project Understanding
The project consists of a rear-loaded warehouse
building of approximately 88,250 square feet to be
located at 101 Independence Lane in Chalfont, PA. The
building measures 350 feet by 270 feet with reentrant
corners. The clear height will be 36 feet as measured at
the far side of the first column in from the loading dock.
Preferred column spacing has been communicated as
being 50 feet deep by 50 wide.
The building will include one (1) primary building
entrance expression. Interior improvements will be
limited to an electrical room and sprinkler room. The
building will have conventional spread footings, load-
bearing insulated precast concrete or site tilt-up
concrete wall panels, and conventional steel frame.
The roof will be a 60-mil EPDM or TPO membrane on
rigid insulation on metal deck. Other characteristics
of the building systems incorporated in this proposal
have been identified in the document titled “Catalyst
Industrial Warehouse - 101 Independence Lane, Chalfont
PA 18914” which was included as part of the Request
for Proposal - Architectural Design Services (RFP).
This proposal is for the shell building only. Tenant-
specific fit-out improvements such as office areas,
shipping offices, toilet rooms, battery charging, etc., are
not included. We understand the project will not seek
third-party validation of environmentally responsible
initiatives, such as LEED V4.1 Warehouse and
Distribution Centers certification, Energy Star, Green
Globes Certification, and Living Building Challenges
as part of the Basic Services outlined in our proposal.
If this were to change, we can provide the design and
administrative services associated with certification as
Additional Services.
We will provide the pre-construction design services
in accordance with the anticipated project timeline
outlined in the RFP.
BERNARDON | Response to Request for Proposal for Design Services Page 30
or Pr
t f
BERNARDON
|
esponse to R
or D
R
eques
oposal f
sociates LL
01 Independence Lane As
ugus
A
t 5, 2022
1 101 Independence Lane Associates LLC | August 5, 2022
|