Page 37 - Bernardon Proposal-101 Independence Lane
P. 37
www.bernardon.com
Compensation
We propose to perform the Basic Services described above for a lump sum fixed fee based upon the
following schedule:
Phase 1 – Conceptual/Pricing Set of Drawings
Bernardon $ 22,000.00
TD&H Engineering $ 9,000.00
Paragon Engineering Services $ 9,000.00
Phase 2 – Permit/Construction Documents Set of Drawings
Bernardon $ 22,000.00
TD&H Engineering $ 9,000.00
Paragon Engineering Services $ 9,000.00
Phase 3 – Construction Contract Administration
Bernardon $ 28,000.00
TD&H Engineering $ 2,500.00
Paragon Engineering Services $ 9,000.00
TOTAL BASIC SERVICES $119,500.00
BERNARDON | Response to Request for Proposal for Design Services Page 34
101 Independence Lane Associates LLC | August 5, 2022