Page 35 - Bernardon Proposal-101 Independence Lane
P. 35

www.bernardon.com















                    •  Details   of   building   storefront,         to observe the progress of the work and to
                       entrances, and window details, and            answer questions regarding the construction.
                    •  Schedule for doors, frames, and               The MPEFP engineer has included three (3)
                       hardware.                                     site visits during construction including the
                   ■ The  structural  engineer  will prepare         pre-final  substantial  completion  observation.
                   drawings that will represent the design           The structural engineer has not included site
                   of the footings and foundations, precast          visits; however, they have included seven (7)
                   concrete wall panels, and details as              online construction progress calls.  Additional
                   required to communicate the primary               site visits can be provided on an hourly basis
                   building framing system.                          including travel time and expenses.
                   ■ Coordinate our services with those of the        ■ We will provide shop drawing review and
                   Owner’s consultants.                              processing of architectural, structural, and
                   ■ Attend coordination meetings to review the      MPEFP components required by the contract
                   progress of the drawings.                         documents.  One (1) review of each required
                   ■ Provide construction documents of the           submittal plus one (1) follow-up review is
                   MPEFP systems.                                    included provided the submittal is made in
                   ■ Provide signed and sealed drawings for use      accordance with the contract documents.  The
                   in the building permit application process.       following shop drawings and submittals will be
                   ■ Prepare    COMcheck        Compliance           reviewed:
                   Certificates.                                      •  Concrete   wall   panels   (architectural
                                                                         features),
               Bernardon will attend meetings with you in your        •  Miscellaneous metals (roof ladder, railings,
               local office as required to finalize the scope of these   steps),
               design services.  Bernardon has included three (3)     •  Aluminum and glass,
               in-person meetings for this phase.  Additional in-     •  Doors, frames, and hardware,
               person meetings if requested will be provided on an    •  Dock equipment,
               hourly basis.  Online collaboration meetings will be   •  Roofing,
               provided as needed.                                    •  Structural components, and
                                                                      •  Mechanical, plumbing, and electrical
               Phase 3 – Construction Contract Administration            components.
               (Limited Scope)                                        ■ Answer contractor Requests for Information
               During the Construction Contract Administration       (RFIs).  We have included a budget of forty (40)
               phase of the project, we will provide the following   hours for this service.
               services:
                                                                  Please note that it is our goal to maintain flexibility
                   ■ Respond to comments from the building plans   in the performance of our services during this
                   examiner.                                      phase and render the most appropriate level of
                   ■ Bernardon will attend one (1) on-site pre-   service.  We can modify our scope of services upon
                   construction meeting and up to eighteen        your request with an adjustment in compensation.
                   (18) on-site construction progress meetings



               BERNARDON  |  Response to Request for Proposal for Design Services                          Page 32
               101 Independence Lane Associates LLC  |  August 5, 2022