Page 11 - Bernardon Interior Design Proposal-Willow Grove Building G
P. 11

www.bernardon.com



















               The following are excluded from the scope of Basic Services:


                   ■ Civil engineering for all site improvements;
                   ■ Landscape Architecture and design inclusive of pool design;
                   ■ Geotechnical engineering;
                   ■ Design and detailing of exterior Architectural elements;
                   ■ Design, documentation, and detailing of landscape irrigation systems;
                   ■ Construction cost estimating and bidding;
                   ■ Interior and exterior signage other than that required by code; and
                   ■ Security system, CCTV, Access Control, and voice and data systems design and documentation.






               Terms and Conditions
               Terms and Conditions of Agreement for Professional Services of Bernardon (Terms and
               Conditions) are included herein and are part of this proposal.

               Reimbursable expenses (such  as permits, prints,  additional consultants,  overnight  deliveries,
               travel, etc.) are not included as part of our professional fees and will be invoiced based upon
               actual costs expended times a multiplier of 1.10.  Mileage will be charged in accordance with
               the standard IRS rate.


               Additional Services can be performed for a mutually agreed upon fixed fee or on an hourly basis
               in accordance with our hourly rates noted in our Terms and Conditions.







               Accepted by:  (check all that apply)
                      Bernardon is authorized to proceed with Basic Services.
                      Bernardon is authorized to proceed with Optional Services for
                   Model Unit FF&E Selection and Specification.
                      Bernardon is authorized to proceed with Optional Services for FF&E Procurement
                   by Bernardon Procures.



                   (signature)                                                         (date)


               BERNARDON | Proposal for Interior Design Services | Federal Realty Investment Trust
               Willow Grove Shopping Center Redevelopment - Phase III - Building G | May 8, 2023          Page 6
   6   7   8   9   10   11   12   13   14   15   16