Project Approach
The project site is located at the northeast PROJECT TEAM
corner of the Willow Grove Shopping
Center. Bernardon’s Architectural team has At Bernardon, teamwork and partnering are
conceptually planned the proposed building the key elements to making a project genuinely
footprint, vehicular access, and floor plates. successful with respect to the final product
and the design and construction process. We
Our scope of interior design services is based believe in a collaborative approach to design
upon the Phase III - Building G part of the where Federal Realty Investment Trust and
shopping center redevelopment. The building other interested parties participate in the design
is understood to be a six (6) level mixed-use process to ensure that issues of constructability,
building with five (5) residential levels over a market requirements, code compliance, building
one (1) level non-combustible podium structure. systems, and construction costs are addressed
Studio, one-bedroom, and two-bedroom along with aesthetic considerations.
residential units are anticipated.
As Discipline Director of Interior Design, Melissa
Based upon the initial block plans, we assume Mayer-Benedetti, NCIDQ will be responsible
the Interior Design scope includes ±10,000 for the overall performance of the project
square feet of Amenity Space, residential team. Olivia Cooper, NCIDQ, Senior Project
corridors, and the basis of design for residential Director, will act as the project manager,
unit finishes and decorative light fixtures. The responsible for preparing the schematic design,
program of the Amenity Space will be developed design development, construction documents,
with the help of the owner’s team. coordination of the work of consultants, and
construction phase services as they apply to
We understand that Federal Realty Investment the scope of Interior Design.
Trust is a committed advocate of protecting
our environment and requires implementing To enhance and support the Owner, Design
the most appropriate sustainable elements for Team, and Construction Manager, we will work
the project. As a validation of the sustainability with the Sustainability Consultant engaged
measures, we will collaboratively with the by the Bernardon architectural team to aid in
architectural team design and document the the management of the USGBC/GBCI LEED
project to achieve LEED Multifamily Midrise process and the Interior Design involvement in
(LEED MFMR) Gold certification as stipulated obtaining the owner’s LEED certification goals
by the United States Green Building Council as outlined.
(USGBC).
BERNARDON | Proposal for Interior Design Services | Federal Realty Investment Trust