Page 60 - All SFAC DOC file
P. 60
Submitted by M/s,Pioneer Holon Agroecology Pvt Ltd
5
1997-2005 : Deptt. of Energy (GRIDCO & OPTCL)Civil Expert & Trainer–
Irrigation, Roads &Buildings Contracts Management
Project Management Unit, Gridco, Odisha
World Bank Mission on Energy Reform Sector
Head of PMU for the World Bank Mission on energy reform sector
for all Civil and allied structural works.
Responsible for all Civil Works of GRIDCO Headquarters and its
periphery
Design, Construction and Maintenance of Civil Structural Units.
Technical Expert in the Inquiry Team for GRIDCO, Civil Works.
Responsible for completion of World Bank funded Training Project,
Chandaka
1993-1997: Welfare(SC&ST) &Panchayati Raj Deptt.
Headed the team in ITDA ,Baripada that successfully completed
60 Bridges and 45 Roads and Minor Irrigation Projects (MIP)
spread over 26 Blocks in Mayurbhanj, Orissa with Contract
Executions for benefit of Tribal Farmers for their best of traditional
croppings
Responsible for creating irrigation potential and lively hood
Projects for Tribals/farmersc of the State through innovative
design of construction of check dams and rock filled Dams in ITDA
and DRDA Baripada.
1982-1993: Deptt. of Water Resources, Govt. of Odisha
Served as Asst. Engineer for Survey & Investigation of
Projects, Design aspects of Irrigation, Roads & Building
works, Quality Control & monitoring with construction
supervisions of the following Major Irrigation Projects
of the State
Part-time lecturer in Saranga Engineering
Colllege,Talcher,Odisha
Rengali Irrigation Project, Samal Barrage
Potteru Irrigation Project, Chitrakonda, Malkangiri
Mahanadi Barrage Project, Cuttack
Detailed tasks Assigned:2019-1982
Review of Planning, Designing, Tendering,Execution,Construction and
Implementation of Dam Projects under DRIP,Monitoring,
supervision and execution of Dam & Irrigation structures with advanced Concrete
Technology
Review of updating and maintaining the plans, permits, and standard operating
procedures.
Review of detailed design and drawings for the projects
Review of construction methodology, QA procedures
Review of procurement, engineering and construction schedule
Review and comment on EPC/Other Contracts
Page 57 of 275