Page 129 - CAPE Green Engineering Syllabus 2016.docx_Neat
P. 129

-8-

38. An energy audit was conducted at an old               40. Riverland is a rural community with two
        office building and a number of faults                    large rivers but no electricity because of
        which result in increased air conditioning                its remote location and distance from the
        (AC) usage were identified.                               electricity grid. Riverland’s community
                                                                  leader writes to a consultancy company
        Which of the following are the three                      asking for ways in which the community
        MOST practical recommendations that                       could use the power from the river.
        could be made to reduce AC
        consumption.                                              Which of the following is the BEST
                                                                  recommendation to meet the needs of the
           I. Redesign the building to utilize                    community?
                  passive cooling.
                                                                  (A) Install a hydroelectric generator
          II. Clean AC vents.                                               in the river to produce energy.
         III. Install a solar system for the AC
                                                                  (B) Install a pump to supply homes
                  unit.                                                     in the community with water
         IV. Close windows and doors when                                   from the river.

                  the AC is ON.                                   (C) Create a dam so the community
          V. Install sensors to ensure the AC                               can build a water park and earn
                                                                            from tourism.
                  only runs when the building is
                  occupied.                                       (D) Install underground pipes from
                                                                            the rivers to supply farms in the
        (A) I , II and IV only                                              community with water.
        (B) II, III and V only
        (C) II, IV and V only                             41. Which of the following is an advantage
        (D) III, IV and V only                                    of the integration of artificial and natural
                                                                  daylight?
39. While auditing the office building, the
        property owner complains of high energy                   (A) Decreased power savings and
        bills and ask for a single recommendation                           reduced pollution
        that can result in a reduced monthly
        energy bill.                                              (B) Enhanced sustainability and the
                                                                            psychological benefits for
        Which of the following would be the                                 occupants during both day and
        MOST suitable recommendation?                                       night

        (A) Install solar panels to produce energy                (C) Provision of sufficient light for
        (B) Install a wind turbine to produce                               the particular tasks at the
                                                                            particular time
             energy from the wind space
        (C) Utilize energy efficient best practices               (D) Retention of sustainability
        (D) Engage in rain water harvesting and                             during the day and night
                                                                            especially for the Caribbean
             recycling techniques                                           environment

                                                          GO ON TO THE NEXT PAGE

02265010/SPEC 2015
   124   125   126   127   128   129   130   131   132   133   134