Page 150 - CAPE Green Engineering Syllabus 2016.docx_Neat
P. 150

-3-                    02265020/CAPE/KMS 2015 SPEC

                          GREEN ENGINEERING
                          UNIT 2 - PAPER 02
                         KEY AND MARK SCHEME

Question 1. (continued)

S.O                      Suggested Response                        Mark         Marks
                                                              Allocation  KC AK PA

2:1:2  (d)                                                    4           4

         1 mark each for calculating L/K = R for
             lightweight concrete blocks and brick

         1 mark for calculating total resistivity
             (Rtot)

         2 marks for calculating U=1/(Rtot)

2:1:3  (e)                                                    4           4

       Role

         Cavity is filled with air which acts as an
             insulator

         Cavity as part of material reduces weight
             density ratio

         Cavity can be used as communication
             channels ( for example, cables for
             telecommunication)
                                     (2 marks for minimum 2)

       Deficiencies

         Can transfer heat by convection
         Can create air leakage
         Can result in condensation if not

             properly sealed
                                     (2 marks for minimum 2)

                                              TOTAL 20 MARKS 12 8 0
   145   146   147   148   149   150   151   152   153   154   155