32
                       Increase Re. 20,926-7-0.
                       174 now premises wore connected during 1367 :—
                          In Manama            169
                          In Muharraq           16
                       Total oon8umorB connected to date 1112.
                       Maximum load recorded 203 k.w.
                       Total kilowatts connected to date 420.
                      Capacity of generating plan 400 k.w.
                      Wiring Contracts. The local wiring contractors continued wiring in the
                 State during 1357. Premises were wired as follows:—
                      (1)  Haji Salman Al-Zayani   143
                      (2)  Haji Khalil Kanoo        6
                      (3)  Haji Yousuf Fakhroo       1
                      Another local merchant Haji Yousuf Al-Moayed, was licensed in 1356.
                      The Department carried out the following wiring of Government and certain
                other premises :—
                      Shaikh Salman bin Hamed’s House and Majlis at Sukhir.
                      Government Girls School at Muharraq.
                      Shaikh Daij, Shaikh Mubarak, and Shaikh Ahmed’s houses at Sukhir.
                      H.H. Sir Shaikh Hamed’s Majlis at Sukhir.
                      New married quarters at Manama Fort (Police).
                      New Dispensary and Doctor’s quarters at Naim.
                      Several other smaller premises;
                      Temporary Wiring. During the 1357 the Cities of Manama and Muharraq
                were specially illuminated on the occasion of the anniversary of the accession of
                H.H. Sir Shaikh Haraed Al-Khalifah, Ruler of Bahrain.
                      2500 extra lights were temporarily installed.
                      Mains Extensions. A 3/ phase pole line was run to Manama Technical
                School on Daly Road to the Bahrain (Cinema) Theatre (approximately 500 yards).
                      A lighting service was run along Prior Road, from Fakhroo’s Amara at
                Naim to the Junction of Shaikh Hamed and Prior Roads, a distance of approxima­
                tely 650 yards.
                      The Fort water pumps were connected by means of a pole line from a point
                 near “C” substation (approximately 400 yards).
                      Alterations to Mains. Three poles were diverted on Belgrave Road in
                 Manama. This was necessary owing to the widening of the town street.
                      One span of the H.T. overhead line crossing Shaikh Mustafa’s premises at
                 Ras Rumman was removed and an underground cable substituted.
                       New Generating Set. A new 6-cylinder 300 B.H.P. Generating set (Mirr-
                 lees Bickerton & Day) direct-coupled to a 200 k.w. 3300 V alternator was erected
                 and put on load in June 1938.
                       Air Conditioning. Air conditioning was introduced into Manama in 1357,
                 the unit system being adopted, each room to be conditioned having a separate unit
                 in it.
                       The first unit installed proved a success and the Government has a number
                 of units which can be hired to the public at Ra. 30 per month (for a minimum
                 period of six months per annum).