Page 272 - Womens Pavilion
P. 272

Oil-Less Claw Medical Vacuum


            2.0  Installation



            2.1  Inspection Upon Receiving                       Place units to ensure high visibility of indicators
                                                                 and gauges and for performing maintenance on the
            The condition of the  LifeLine® Claw Medical         system.  Refer to your installation diagram.  If you
            Vacuum System should be carefully inspected          do not have one, please contact BeaconMedæs
            upon delivery. Any indication of damage by the       Technical Support at 888-4-MEDGAS.
            carrier should be noted on the delivery receipt,
            especially if the system will not be immediately     2.3  Location
            uncrated and installed. BeaconMedæs ships all
            systems F.O.B. factory; therefore, damage is the     The LifeLine® Claw Medical Vacuum system should
            responsibility of the carrier, and all claims must be   be installed indoors in a clean, well-ventilated
            made with them.  Claw systems may remain in their    environment.  Areas of excessive dust, dirt or other
            shipping containers until ready for installation.  If   air-borne particulate should be avoided.
            LifeLine® Claw systems are to be stored prior to
            installation, they must be protected from the        Certain considerations should be given to the
            elements to prevent rust and deterioration.          placement of the system.  The package may be
                                                                 installed in a location that is fl at, level, and will
            DO NOT REMOVE the protective covers from the         support its weight.  Clearance between the unit
            inlet and discharge connection ports of the unit     and adjacent walls should be no less than 24”
            until they are ready for connecting to the hospital’s   to ensure suffi  cient  airfl ow for cooling.  There
            pipeline distribution system.                        should be a minimum of three feet of clearance
                                                                 in front of the control panel for safe operation
            2.2  Handling                                        and maintenance.  A vertical distance of 24” is
                                                                 required above the modules for ventilation and
                                                                 maintenance.
                               WARNING:
             USE APPROPRIATE LOAD RATED LIFTING                  No special foundation is required.  However, all
             EQUIPMENT AND OBSERVE SAFE LIFTING                  units must be securely bolted using all mounting
             PROCEDURES DURING ALL MOVES.                        holes provided.  If a raised concrete pad is used,
                                                                 the module bases must not overhang the concrete
                                                                 base.  A method to drain away moisture is
            The vacuum package can be moved with either a        necessary.
            forklift or dollies. Keep all packing in place during
            installation to minimize damage. Walk along the      Adequate ventilation is required.  The pumps are
            route the unit must travel and note dimensions       air-cooled.  Therefore, it is very important that the
            of doorways and low ceilings.  LifeLine® Claw        ambient temperature should be between 40˚F
            systems are designed to go through 36” doorways.     and 105˚F (if the maximum ambient exceeds
                                                                 105˚F, contact factory for special instructions).
            Most Single Point Connection systems can be          The system should be located as close as possible
            separated to fi t through 36” doorways (Pentaplex     to the point of usage to prevent excessive loss of
            and Hexaplex control skid bases measure 40.5”).      operating vacuum due to pressure drop.
            If  separating bases, carefully label all removed
            electrical connections for easier re-assembly at the   When selecting the location for the system,
            fi nal destination.                                   remember to keep in mind the requirements for
                                                                 service, such as cleaning, changing fi lters,  and
                                                                 changing oil.





                                                             2-1                                  4107 9000 95.04