In most locations the water table is likely to        studies and LLFA detailed requirements can
      Local SuDS requirements
           be found at depths of less than 3 metres.             be found on Newham webpage as below:
           Ground water source protection zones are              LB Newham Flooding Webpage
           found in the northern part of the borough.
                                                                 Newham Local Plan

                                                                 Flood Risk and Sustainable Drainage:
                                                                 Requirements and Guidance for Planning
                                                                 Application

                                                                 Newham LLFA drainage pro-forma

                                                                 Planning Application Requirements


                                                                 Highlights of main requirements:
                        Fig.5 Newham’s main made ground
                            (grey/grey hatched) and source       •  All major development is required to
                          protection zones (shades of pink)          restrict post development runoff to
                                                                     greenfield run-off rates unless it can be
           The combination of these factors may limit                demonstrated that site conditions prohibit
           potential for infiltration drainage. However,
                                                                     the ability to do so.
           given the high variability in ground conditions
           found across the borough, it is recommended           •  All development must restrict runoff
           that developers carry out thorough ground                 discharge within or to Critical Drainage
           investigations to establish the potential for             Areas (CDA) to greenfield rates or below.
                                                                     N.B. there are 15 CDAs in Newham.
  23       infiltration.  It should be noted that none of        •  Discharge to tidal water (i.e.  River
           the above prevents use of SuDS within a
           development, if integrated into the design at             Thames, Lea and Roding) will need to
           an early stage. In any case, above ground no              take account of the effect of “tide
           infiltration SuDS measures can still be used in           locking”, storm surge or submergence of
           areas of contaminated ground provided that                the outfall, in order to prevent flooding.
           barriers to contain contaminants, such as                 An appropriate allowance in terms of
           impermeable liners, are used to protect                   onsite storage should be built into the
           groundwater.                                              drainage strategy.

                                                                 •  Discharge to tidal water may not be
           Local SuDS specific requirements
                                                                     restricted to greenfield provided scour/
           Newham has developed a number of                          erosion would not result, however a level
           documents in connection with local flood risk             of attenuation will be expected - normally
           assessment and management. Main                           a 1 in 30 attenuation - to create SuDS
           requirements applicable to major                          features that provide additional benefits.
           development are fully embodied in Newham’s            Application of Greenfield Runoff Rates
           local policy (Newham Local Plan 2018).
                                                                 To enable consistency of assessment
           Links to relevant Newham policy, flood risk
                                                                 between planning applications, Newham