Page 29 - SuDS Design & Evaluation Guide-Newham V2 Pages_Neat
P. 29

LLFA, in its Statutory Consultee function,             SuDS, nor LCY’s objection accepted without
      requires that greenfield runoff calculations           site specific evidences and mitigation
      should be performed using the IH124 method             requirements provided to be evaluated by
      as supported by the HR Wallingford UK SuDS             Newham Local Planning Authority.
      online greenfield runoff rate estimation tool.         London City Airport guidance on biodiversity
      Under the same concern greenfield                      and safeguarding
      calculations should adopt the default
      parameters (e.g. soil type) as provided by the         Pre-planning advice                                   Local SuDS requirements
      UK SuDS tool as characteristic of the                  Newham LLFA can provide pre-application

      application site location.                             advice for developments as part of a pre-
      Newham LLFA will not object to greenfield              application consultation agreement with
      runoff calculations based on Flood                     Newham Local Planning Authority.
      Estimation Handbook (FEH) methodology,                 Please note that a fee specific to LLFA
      provided that the results are demonstrated to          services is required:
      be largely consistent with IH124 methodology           Pre-Application Advice Guidance Note &

      output from UK SuDS online tool and                    Charging Schedule
      representative of the application site in a
      pre-development greenfield condition.                  LLFA advice can include providing specific
                                                             information on local flood risk, review of
      Newham LLFA does not accept the following              information provided by developer relevant
      approaches:                                            to the SuDS design and making
      •  urban soil types for Greenfield runoff              recommendations on compliance with local
          estimation                                         and national policies.                                24
      •  applying urban catchment parameters to
          runoff estimation                                  The above could be arranged by contacting
                                                             Newham Planning Authority development.
      Local LPA and Stakeholder Engagement                   control@newham.gov.uk

      In addition to LLFA the Environment Agency             Adoption of SuDS
      and Thames Water must be consulted with
      concern of flood risk, discharge consents,             Newham will not adopt SuDS unless
      building in proximity to flood defences                undertaken by LB of Newham on council
      structures and watercourses.                           owned land.  Applicants should therefore put
                                                             in place arrangements for maintenance and
      London City Airport (LCY): Under concern of            end of life replacement of SuDS. Details must
      risk management (i.e. bird strike) LCY may             be provided to the LLFA to add to its asset
      object to development proposal deemed                  register. There are other Risk Management
      potentially to increase of bird presence in the        Authorities, such as Thames Water or TFL
      airport safeguard area. Whilst this concern            that may be willing to consider adoption of
      should be heeded and early consultation with           SuDS. Early engagement with the relevant
      City Airport is advised, LCY’s general concern         party is critical to ensure their requirements
      should never be used to scope out                      can be achieved.
      requirement of green infrastructures,  such


      Newham Council SuDS D & E Guide                                                                        © 2020 McCloy Consulting & Robert Bray Associates
   24   25   26   27   28   29   30   31   32   33   34