Page 14 - Portfolio
P. 14

08                                                                            hospital, food stall & offices with a nominal profit margin. The water plant with
        LUKE WATER TREATMENT PLANT                                                    pure drinking water bottle and jar production facility, a custom-designed facility
        Design-Build    Location: Shibchor, Madaripur.                                for a manufacturer, represents collaboration between a client and an architect
                                                                                      in developing a spatial strategy that integrates production goals with the well-
        Project Lead: AFH-Dhaka   Client: Shariar Hossain                             being of employees. Key design objectives focused on transparency and a single
        Area: 4000 Sq. foot   Cost: $40000                                            volume that makes full use of the site as well as the use of local materials like
        Project Architect: Md. Imrul Kayes                                            Palm wood and bamboo, recycled steel fully natural light & ventilation reduced
        Design Team: Omar Faruque, Imrul kayes, Rabeya Rahman, Naquib Hossain         energy use, and enhanced thermal performance. The architect responded with
        Structural Engineer: Mustafa ashique ali,  MEP : Hafizur Rahman,              a single, large structure where administration and production spaces were
        Construction: S.M. Jewel and his team.                                        integrated under one roof, breaking down hierarchies between front- and back-
                                                                                      of-house functions. The wooden louvres with glass in southern and northern
        [this water plant including production facilities of mineral water bottle and jar is   façade, as well as gardens give each user access to natural light and views of
        conceptualized as a social business model for riverside communities. Production   nature; the spaces also provide recreational areas for the workers on river side,
        capacity: 2000 gallon/hour method of treatment: Reverse Osmosis systems with   Signalling a departure from the generally poor standards of places of work
        UV Sterilizers.]                                                              around Bangladeshi manufacturing sector. The factory sets a new benchmark
                                                                                      for the design and construction that priorities aesthetics and the comfort of the
                                                                                      users without significant cost premiums. The result can show possibilities with
        Luke water plant including production facilities of mineral water bottle and jar   a strong business mandate that seeks to inspire other industrial persons to be
        had been conceptualized as a social business model for riverside communities   more engaged and more passionate about the environment and the planet.
        with an aim to ensure safe drinking water. It can be implemented anywhere and   Project could become a model of small scale social business with a greater cause
        make access of safe drinking water to school & college student, health clinic,   in mind to provide access of safe drinking water.
































                                                                                                                                                                    14
   9   10   11   12   13   14   15   16   17   18   19