Page 3 - AsiaElec Week 49 2021
P. 3

AsiaElec                                       CONTENTS                                             AsiaElec



                                                    www. NEWSBASE .com
                                             AsiaElec







                                                   Asia Power Monitor




                         COMMENTARY

                         Are India’s 100-GW solar ambitions within reach?                      4
                         Fitch: Wind power pipeline up by almost 33% in six months             5


                         POLICY

                         IA Group divests from coal                                            7

                         UN’s Espinosa stresses need for quick follow up on Glasgow goals      8


                         HYDRO

                         Pakistan’s Chinese-built Mohmand Dam to be open by 2025               9


                         BATTERIES

                         Li-ion battery recycling not expected to take off before 2030       10


                         RENEWABLES

                         Vietnam’s 48-MW Tra Vinh wind farm begins commercial operations  11
                         Kawasaki sets 2030 carbon neutral target, but only at domestic

                         operations                                                          12
                         US to provide $500mn in soft loans to support Indian solar
                         manufacturing                                                       13


                         NEWSBASE’S POWER ROUNDUP GLOBAL                                      14






















                                 Have a question or comment? Contact the editor – Richard Lockhart (rlockhart@newsbase.com)
       Copyright © 2021 NewsBase Ltd. All rights reserved. ISSN 2632-5047. No part of this publication may be reproduced, redistributed, or otherwise copied without the written permission of the authors. This
       includes internal distribution. All reasonable endeavours have been used to ensure the accuracy of the information contained in this publication. However, no warranty is given to the accuracy of its contents
       Week 49   08•December•2021               www. NEWSBASE .com                                              P3
   1   2   3   4   5   6   7   8