Page 105 - E-BOOKLET VERSION OF 2020-21 CCM Total Booklet with profiles
P. 105

7.  Representations from MP/MLAs:
              Shri GALLA JAYADEV, Hon’ble Member of Parliament, GUNTUR:

               S.No.                Representation                                Action taken
                                                                   Guntur is NSG-3 Station. On an average
                      Development of Guntur Railway                21,102 outward passengers with earnings
                      Station:                                     of Rs.17, 75,917/- per day are dealt at the
                      After selection of Thulluru Mandal of        station.
                      Guntur  District  as  a  new  Capital  Area  of   At present 7 nos. of platforms are
                      Andhra Pradesh, Guntur station needs to be   available.  Construction work of 8th
                      given  the  status  of  one  of  the  Capital  platform is under progress.
                      Stations and providing  facilities. The long  At Guntur Railway station one General
                      pending Blue Print to improve the Guntur  Waiting hall is available in front of the
                      Station is to be made reality at the earliest.   booking office.
                                                                   At PF.01, one Sleeper Waiting Hall (For
                      Development of western side of the Station   Gents & Ladies) and One Pre-Paid  AC
                      with another (No.8) platform  par with       Waiting Hall is available.
                      Platform No.01 so as to receive all types of   At PF. 04, Two Sleeper Class Waiting Hall
                      trains and to provide with all facilities like   is available.
                      Waiting Halls, Restaurant and Parking        One Lift is available to cater the needs of
                 1    place. All the Platforms are to be connected   needs of the passengers.
                      with a new Foot Over Bridge (FOB) provided
                      with Escalators wherever necessary and       Work of installing two Escalators and two
                      convenient to passengers.                    Lifts is under progress.
                                                                   One IRCTC Cell Kitchen (at PF No. 4) is
                      A foot over bridge is required at the station  available for the convenience of
                      connecting east side (Govt, General Hospital  passengers.
                      Road) to west side (First line of Arundalpet)  Foot over bridge connecting to all
                      of the station for the Public to cross over to   platforms with east and west circulating
                      other side. The participation of Guntur      area work is under progress.
                      Municipal  Corporation  (GMC)  wherever      Development of West Terminal work is
                      required will also to be informed to them.    under progress.

                                                                   The four lions statue on top of PF-4/5
                       The symbolic four lions pillar on Platform   station building is an old cement cast
                       No.04  be shifted  to a prominent and       statue. It is already cracked and removing
                       convenient  place on eastern side  of the   it from its existing location may damage it
                       station giving facelift.                    altogether.

                      Provision of ramps  for FOB at
                      various stations, for the use of
                      differently abled persons:

                      Differently  abled   persons   are   facing
                      difficulty due to unavailability of ramps for
                      FOB/due to unavailability of path way at the
                      end of  the platforms for passage of wheel
                      chairs   at  various   stations   including
                 2    Mangalagiri,   Namburu,     Vejendla   and
                      Sangam     Jagarlamudi.   For   easy   and
                      convenient movement of differently abled
                      persons, I request you to provide Ramps for
                      Foot Over Bridges/pathway at the end of the  There is a passenger footfall of 95 per day
                      platforms, to facilitate boarding of trains at  at this Halt station. Platform end pathways
                      other than main platform by  differently  have been provided.
                      abled persons, as per Railway Board
                      instruction      vide       Letter      No.
                      2012/LM/PA/08/Policy/PWDs            dated
                      06.06.2013




                                                          117
   100   101   102   103   104   105   106   107   108   109   110