Page 5 - Barr&Barr_Cost Proposal
P. 5

3.     REQUESTED ALLOWANCES

                          A.     SCHEDULE OF REQUESTED ALTERNATES

                          1.     Allowance No. 1

                                 In addition to allowances for wastage and standard construction  tolerances
                                 calculated and provided by the Contractor, 50 cubic yards of installed (fc=5,000
                                 psi)  concrete shall be included in the concrete bid as a separate price for
                                 additional materials to be installed at the discretion of the Architect and/or the
                                 Engineer.

                                                                     Allowance Value       $   50,000

                          2.     Allowance No. 2

                                 In addition to allowances for laps, bends and wastage calculated and provided by
                                 the Contractor, 10 tons of  fabricated  , installed steel reinforcement shall be
                                 included  in  the  concrete  bid as a separate price for additional materials to be
                                 installed at the direction of the Architect and/or Engineer.
                                                                     Allowance Value       $   35,000




                          3.     Allowance No. 3


                                 Winter Concrete Allowance

                                                         of
                                 2017 winter concrete operations will need to be considered.
                                                                                           $  5,000

































                   Addendum No. 3                  COST PROPOSAL FORM                                BF-3