Page 23 - Barr&Barr_HealthcarePortfolio.indd
P. 23
Maimonides Medical Center
Facilities Modernization
SIZE OWNER
81,000 square feet Maimonides Medical Center
CONTRACT TYPE ARCHITECT
CM-at-Risk PEAPC, LSGS, Guenther 5
Associates Architects
PROJECT DETAILS
Th e Maimonides Medical Center Major Modernization Project consists • Expansion of the Emergency Department
of the construction of a nine (9) story addition to the present Aaron
• Expansion of Neo-Natal ICU
Building. Th e new building also connects to the existing Gellman
Building. A new elevator and utility core serves all three (3) buildings. • Replacement of Medical/Surgical beds
• Increase in the number of Operating Rooms and
Renovation of the existing Aaron building was done with the new
replacement of existing Operating Rooms
construction.
• Replacement of Medical ICU beds
In addition, the new Ambulatory Surgery facility was built in the
Garage Basement across from the new addition on 48th Street. A two
(2) story bridge connects this facility to the new building as a direct
connection between in-patient and Ambulatory Surgery. New elevators
were constructed in the Garage to complement this connection.