Page 11 - BarrandBarr_135 W 50th Street HVAC Cooling Tower_7.28.17
P. 11

Ronald F. Cardillo, LEED AP

                                                Vice President, MEP Manager NYC


         EDUCATION                                                               CONTACT INFORMATION
         Utica Free Academy                                                      315.750.0601
                                                                                 RCardillo@barrandbarr.com
         Certifi cation
         Mohawk Valley—MEP Estimating and
         Business Management
         NYS Master Plumbers License
         MEMBER OF
         GBC, NFPA,ASHRAW, CHYSHE, HESGNY and
         ASME
         YEARS OF EXPERIENCE
         34

         YEARS WITH BARR & BARR
         16



        As the MEP Project Manager for Barr & Barr Ron brings his extensive mechanical and electrical experience complemented
        by his LEED accreditation.  This allows him to support the early on design development and a cost and installation eff ective
        means.  His hands on attention to systems and commissioning accelerates a seamless transition in turning over the MEP
        operations to the Owner.


        SIMILAR PROJECTS
        Cornell University, Roosevelt Island, NY
        The Bloomberg Center
        (Planned Completion October 2017)
        Th  e Bloomberg Center is the fi rst of several buildings to be
        constructed of the new Cornell NYC Tech Campus on Roosevelt
        Island.  Th  e Bloomberg Center provides graduate students, faculty
        and administrators with a new facility for research and education.  Th e
        building design refl ects Cornell’s goals of creativity and excellence,
        providing fl exible academic spaces and pioneering new standards
        in building performances and sustainability.

        Crum & Foster, Morristown, NJ
        Corporate HQ
        Th  is project includes the complete interior gut, MEP replacement
        and renovation of the existing four story building which will be
        transformed into a Class A Headquarters for Crum & Foster. In
        addition to the interior renovation the exterior of the building will
        receive a new skin and a new 515 space parking structure will be
        built concurrently.

        Bayer Healthcare, Hanover Township, NJ
        Corporate HQ
        675,000 SF, Pursuing LEED Gold. Th  e new U. S. Headquarters
        for Bayer Healthcare was constructed in two phases. Th e fi rst
        linked two existing offi  ce structures with a fi ve-story glass atrium.
        Each of the structures was renovated; one with a two-story vertical
        addition. In addition to these Class A offi  ce buildings, one of the
        existing research buildings was rejuvenated as a fi tness center. As
        part of this phase, approximately 2,500 on-grade parking spaces
        was constructed within parking fi elds surrounding the buildings.
   6   7   8   9   10   11   12   13   14   15   16