Page 35 - KUH Refresh Proposal 8.14.17
P. 35

Anthony Goodell
                                                    Patient Building Superintendent


            EDUCATION
            Rutgers University
            Civil Engineering Technology

            Rutgers University
            for Construction Project Management
            YEARS OF EXPERIENCE
            19
            YEARS WITH BARR & BARR
            13









           First in and last out the door: Anthony is a leader in commitment.  His deep focus on construction details, on the construction
           schedule, on the construction budget, and on his demand for the highest quality, will benefi t the owners, architects, and
           subcontractors alike. Subcontractors in particular appreciate his skillful, logical organization of the work fl ow to maximize
           productivity.


           SIMILAR PROJECTS
           Capital Health, Trenton, NJ                            Burlington Coat Factory, Florence Township, NJ
           107,000 SF. Fuld Campus - Regional Perinatal Center  207,000 SF. The new multistory Class “A” headquarters will
           Renovation.  Area renovations included Sleep Lab; Escort  feature an open offi ce layout, a wide range of amenities, and
           Services; Partial Hospital (Corporate Health Center); Data  a variety of spaces designed to bring Burlington’s diverse
           Center; 12 Bed Med/Surg Unit; 10 Bed Pediatrics; 36 Bed  workforce together. Informal meeting spaces, a two-story
           Med/Surg Unit; Maternal Fetal (Mem); Labor, Delivery,   atrium, conference and training rooms, a fi tness center, an
           Recovery and Postpartum (LDRP);and Neo-Natal Intensive   outdoor meeting and lunch space, and café will all provide
           Care Unit (NICU) Support.                              opportunity to converse, meet, and connect.

           Rutgers University, Piscataway, NJ                     New Jersey Realtors, Trenton, NJ
           145,000 SF. This is a new four story  (above grade) Chemistry   22,000 SF. This new three story Headquarters building will
           and Chemical Biology with a basement and penthouse. The   provide accommodations primarily for offi ce functions,  along
           new building will house classrooms, administration offi ces,   with support and conference space for departmental needs
           research laboratories and a 120 seat auditorium.  The lobby   on the second and third fl oors.  The interior offi ce space will
           doubles as a presentation and gathering space and the  basement   be constructed in a practical, effi cient and fl exible manner
           includes specialty imaging facilities.                 with full maximization of daylight direct and borrowed. The
                                                                  ground fl oor will provide retail and offi ce rental space.  The
           Trinitas Hospital, Elizabeth, NJ                       exterior of the building will consist of a combination of brick,
           20,000 SF. Located in the heart of downtown Elizabeth the   precast and glass curtain-wall with vision and spandrel glass.
           project includes the operational headquarters & dispatch center   A portion of the building’s roof will be a terrace designed for
           for the Mobile Intensive Care Emergency Response units for   regular access by staff and visitors.
           Trinitas Regional Medical Center, as well as the Community
           Education Center and offi ces of the Trinitas Foundation. The
           facility is a 2 story steel & concrete structure located on a 2
           acre site previously occupied by  retail stores and an offi ce
           warehouse all on the banks of the Elizabeth River.
           Trinitas Hospital, Elizabeth, NJ
           14,000 SF. The project required the total gut demolition of
           the space while at the same time not disturbing the services
           of the renal dialysis and endoscopy centers on the fl oor
           immediately below.  Detailed phasing scenarios incorporating
           “after hours” shift work  accommodated the installation of the
           new mechanical, electrical and plumbing systems.  High end
           fi nishes throughout the project have created a warm, caring
           environment for the patients.
   30   31   32   33   34   35   36   37   38   39   40