Page 43 - KUH Refresh Proposal 8.14.17
P. 43

Richard Lent, LEED AP

                                                       Vice President Estimating


            EDUCATION
            University of Oregon
            B.S. Construction Management


            YEARS OF EXPERIENCE
            33

            YEARS WITH BARR & BARR
            29










           Dick has 33 years in the industry working solely in the Mid Atlantic region. His fi nger is on the pulse of accurate up to date
           market pricing indexes.  He constantly monitors the construction industry looking for volatility that could impact pricing or
           availability.  Dick is always looking to be ahead of the pricing curve.



           SIMILAR PROJECTS

           NY Hospital Queens, Flushing, NY                        North Shore LIJ Hospital Center, New Hyde Park, NY
           301,425 SF. The New York Hospital Queens Master Plan Project  5,000 SF. The scope of work included a new 15 Bed Cardiology
           featured a seven-story, 202,000 square foot addition, as well  Holding Unit, Replacement of the Gamma Camera, a fourth
           as renovations to adjoining areas of the Hospital. The West  Cardiac Catherization Lab and an Electrophysiology Lab (EP).
           Wing Addition includes a new Ambulatory Surgery Center,
           new main entrance and lobby, Non-Invasive Cardiology Suite,  Northern Westchester Hospital Services, Mount Kisco, NY
           two fl oors of Med/Surg beds and Medical Practices offi ces  18,000 SF.. The Surgical Services Project expanded the existing
           on the basement level.                                 surgical suite by 18,000 s.f.  adding six new OR’s and 14 PACU
                                                                  stations to their surgical suite.  This project was built over the
           Hudson Valley Hospital Center, Cortlandt Manor, NY     existing ED and required the structural reinforcing of existing
           127,000 SF. The Hudson Valley Hospital Center Major  facility to accommodate the new facility built on the former
           Modernization project expanded the current facility with a  roof of the existing ED.
           new four-story patient bed tower that includes patient and
           dialysis rooms on three fl oors and a new entry lobby and  Lutheran Medical Center, Brooklyn NY
           expansion of the Emergency Department on the main fl oor.  EMERGENGY AND SICU DEPARTMENT
           The new two-story addition includes two new state-of-the-  9,840 SF. A HEAL 7 Grant funded the renovation of the existing
           art operating rooms with holding/recovery areas and PT/OT  Emergency Department and the upgrade of the existing SICU
           room. The existing PCU has been expanded by an addition  Department. Emergency Department:  Upgrade includes the
           on the existing second fl oor roof. The site was reworked to  addition of treatment areas, isolation rooms and upgraded
           accommodate the new construction and a three-story, 450  mechanical infrastructure. SICU Department:  Renovation
           space, parking garage was included.                    includes the upgrade of patient rooms, including the installation
                                                                  of new patient headwall units, medical gas upgrades and new
           Maimonides Medical Center, Brooklyn, NY                electrical services.
           81,000 SF. The Maimonides Medical Center Major Modernization  Both projects include new HVAC upgrades which include the
           Project consists of the construction of a nine (9) story addition  installation of two new rooftop air handling units.
           to the present Aaron Building.  The new building also connects
           to the existing Gellman Building.  A new elevator and utility  MAJOR MODERNIZATION
           core serves all three (3) buildings. Renovation of the existing  This fast track project consisted of extensive renovation to high
           Aaron building was done along with the new construction.  volume clinical areas including the Emergency Department,
                                                                  Labor and Delivery, Radiology Department, Endoscopy Unit and
           South Nassau Communities Hospital, Oceanside, NY       fl ooring upgrades to the entire Operating Room Suite.  Included
           14,000 SF. The South Nassau Communities Hospital  in the program was the extensive upgrade to the resident on
           Emergency Department is expanding. This is southern  call areas, the renovation to the MIS Department, construction
           Nassau County’s only Trauma Level II Center. Looking  of the New Medical Records Department and renovations
           to continue their state-of-the-art emergency care to the  to the Building Systems/Service areas.  Additionally, major
           residents of the South Shore, this project will increase the  mechanical upgrades were performed to the existing roof top
           Emergency Department’s square footage from 16,000 to  air handler units and a major upgrade was performed to the
           30,000 square feet. This will give them the necessary room  existing vertical transportation system.  This work included
           to accommodate a projected 70,000 patient visits each year  the mechanical and cosmetic upgrade of 8 elevators and the
           as well as establish dedicated areas for behavioral health and  conversion of 4 existing lifts to freight elevators.
           pediatric emergencies
   38   39   40   41   42   43   44   45   46   47   48