Page 98 - Mercy College_BarrandBarr_7.26.17
P. 98
460 West 34th St., 10th Fl.
New York, NY 10001
Phone: (212) 563-2330
Fax: (212) 967-2297
www.barrandbarr.com
Maintain Two (2) Means of Egress out
of Victory Hall during construction. VICTORY HALL
Create a path separated from ADDITION/RENOVATION
construction around loadind dock and
DOBBS FERRY, NEW YORK
Compactor Area
Temporary Partions:
1. Construct dustproof partitions with
gypsum wallboard with joints taped on
occupied side,
and fire-retardant plywood on
construction operations side.
2. Insulate partitions to provide noise
protection to occupied areas.
3. Seal joints and perimeter. Equip 1 07/26/17 CM Bid Package
partitions with dustproof doors and
security locks. NO. DATE: ISSUED:
Egress to main entrance of Victory Hall 4. Protect air-handling equipment.
5. Provide walk-off mats at each SITE LOGISTICS
entrance through temporary partition.
PLAN - Egress &
Temporary
Partitions
SCALE: NTS
JOB NO:
DRAWN BY: RG
CHECKED BY: KS
SL-05