Page 53 - IAGC The Voice 2017
P. 53

IAGC


                           MAKES IMPACT IN BRAZIL





        IAGC DEVELOPS TOOLS                  IAGC JOINS CORAL SOL                 IAGC HOLDS BRIEFING
        TO IMPROVE BRAZIL                    WORKGROUP                            WITH SDT
        PERMITTING
              an environmental database and  BIAGC joined their workgroup  I         n March 2017, the IAGC made a
                                                  y invitation of Brazil's Ministry of
                                                  Mines and Energy (MME), the
                                                                                                    to
                                                                                                          the
                                                                                                                 new
                                                                                     presentation
              he IAGC leads the effort to create
                                                                                     Superintendent  at Superintendence
        Tenvironmental sensitivity matrix  formed to discuss and draft a report on  Department of Technical Data (SDT) and
        to streamline and enhance industry  Orange Cup Coral (Coral Sol), considered  his team regarding the costs imposed by
        permitting requirements in Brazil. The  for upcoming regulation. MME invited  an ANP regulation dealing with technical
        matrix generates individual percentages  the IAGC to join the group because of the  data, the confidentiality period on data
        for each applicable aspect to "translate"  potential for seismic vessels to be greatly  acquired at  the Equatorial Margin and
        the level of overlap among respective  affected by potential regulation.    changes to the procedure for data
        areas of occurrence within an operation                                   approval.
        area. It also indicates a general level of  The first workgroup meeting was held 16
        potential impact – low, moderate or  March. This was also the first interaction  The IAGC subsequently met with ANP in
        high – considering all applicable aspects  for the workgroup with the ANP‘s Natural  April to discuss the issues and presented
        of operation, including area, time, and  Gas and Biofuels and the Brazilian  information to demonstrate the relevance
        localization.                        Institute of Environment and Renewable  of the industry, including investments
                                             Natural Resources (IBAMA).           made by seismic companies since the
        We continue to meet with government                                       opening of the market in Brazil to present
        officials as structural changes to the  Other organizations involved in the  day, as well as future investment plans.
        Federal bureaucracy happen, to ensure  workgroup include the Ministry of
        these environmental tools are officially  Environment,  Science and Technology
        adopted by the relevant agencies.    Ministry, Navy, National Confederation
                                             of Industries, Petrobras and others.






                                                                                                                53
   48   49   50   51   52   53   54   55   56   57   58