Page 54 - KOP Panborneo Highway Report Card Jan-june 2017
P. 54
Quality assurance & control road pavement works
Bottom subgrade layer
Schedule Minimum
Item Description Type of Test done & pass
Total Required
1 Selection of Suitable Atterberg Limits; Natural 112 sets 129
Material from Borrow Pits Moisture; Standard
for Subgrade Bottom Layer Compaction;
4-days Soaked CBR
2 Bottom Subgrade Field Density Tests 3440 nos. 1035
Compaction
51