Page 56 - KOP Panborneo Highway Report Card Jan-june 2017
P. 56

Quality assurance & control                                                                   road pavement works

                                                                                                         road base layer


                                                                                                   Schedule Minimum
                 Item        Description                      Type  of Test                                                    done & pass
                                                                                                     Total Required

                   1         Approval of Material             JKRSSRW Physical Property               1 set/ source                 2
                             Source                           Tests





                   2         Suitability of 38DCR for         Gradation; Atterberg Limits;            280           sets           169
                             Road Base from Stockpile         Natural Moisture; Standard
                                                              Compaction; 4-days Soaked CBR


                   3         Field Compaction for Road        Field Density Test                        5221 nos.                  1187
                             Base





















          53
   51   52   53   54   55   56   57   58   59   60   61