Page 4 - GSP_Granary_Gateway_OM_Debt
P. 4

Investment Highlights








               Adaptive Reuse of the Iconic Hotel RL

               •   First phase of a landmark mixed-use project, currently under redevelopment                  EXISTING 216
                   with demolition permits in hand for the conversion of the existing hotel’s south            HOTEL KEYS
                   tower into a market-defining 184-unit multifamily offering

               •   Repositioned apartment component will boast well-appointed studios with
                   floor-to-ceiling and wall-to-wall windows commanding unobstructed views
                   of Salt Lake City and the Wasatch Range, complemented by an elevated hotel-

                   inspired amenities package

               •   Acquired the property off-market in December 2019 for $33 million ($85/key),
                   with an attractive all-in cost basis below $180K/unit post-conversion of the
                   south tower (exclusive of excess land sale)


               Irreplaceable Downtown SLC Location

               •   Located on a coveted 4.6-acre site in the Granary District of Downtown Salt
                   Lake City within a 15-minute walk to many of the City’s major demand drivers,
                   including Vivint Smart Home Arena, The Gateway, City Creek Center, Salt Palace
                   Convention Center, and Temple Square                                                                      North Tower

               •   Transit-oriented location just a 2 blocks from a TRAX light rail station; one mile
                   from the state’s largest commuter hub, Salt Lake Central Station; and within a
                   15-minute drive of Salt Lake City International Airport

               •   Strategically positioned at the epicenter of new development in the region, with
                   1+ million square feet of office; thousands of multifamily units, restaurants,

                   bars, and cultural attractions; and a new light rail stop expected over the
                   next decade


                         ANARY G
                                 A
                       |  GR
                    4  |  GRANARY LABSTEWAY
                    4
   1   2   3   4   5   6   7   8   9