Page 8 - Microsoft Word - TECHNICAL SPECIFICATION- APOLLO HOSPITALS TEYNAMPET
P. 8
Document Name: TECHNICAL SPECIFICATION DOCUMENT NO.: ESCP-AUDOC-TESP-002
31 Quality
31.1 Quality in Raw Material Quality control procedure is prepared and
adopted while receiving raw materials from
suppliers.
31.2 Quality in Production Each and every products manufactured are
undergoing inspection by a qualified
inspector and based on the report, product
will be delivered for erection.
31.3 Quality in Erection Inspection is carried out during erection
stage by stage and only after confirmation
next stage of erection is followed.
32 Civil Foundation (Client Scope)
32.1 Type of foundation Will be designed by client according to the
soil report
32.2 Foundation Design Will be incorporated by client as per layout
requirement.
32.3 Design Load Calculation for Will be given by E STAR for the finalized
Foundation design, to decide the foundation type.
32.4 Scope of work for civil The scope is on the client side. We will
foundation provide the load calculation details, as per
layout.
33 Cladding (Client Scope)
33.1 Type of cladding Will be designed as per layout requirement
33.2 Scope of Cladding We shall provide the design and installation
of cladding as per layout requirement
34 Fire Fighting Equipment (Client Scope)
34.1 Design of System We shall provide the adequate design for
firefighting as per standards and provide
layout for the same.
34.2 Scope of installation This Scope is on client side. We shall provide
7