Page 26 - Property Rights in the Philippine A Time and Cost Study_July 2017
P. 26

PREPARATION OF
 CONSOLIDATED
 CADASTRAL MAP AND
 LAND CLASSIFICATION
 MAP



 Actor
 4   Barangay Lot Status   Head of the Mapping Division   CCM and LCM for the priority   NA   20 days
 (Regional Office)   barangay


 Activity
 Prepares the Consolidated
 Cadastral Map (CCM) and Land
 Classification Map (LCM)







 PREPARATION OF RAPID
 LAND TENURE
 APPRAISAL


 Actor
 1.  Barangay Lot Status   CENRO DPLI   RLTA form with Lot Number
 5   2.  CCM and LCM for   and Survey Claimant and   NA           30 days
 the priority barangay  Activity   Status (Excel file and/or
 printout)
 Prepares the Rapid Land
 Tenure Appraisal Form (RLTA).
 Fills up Lot Number and Survey
 Claimant data on the form





 1.  CCM and LCM for   FILLING UP OF RLTA   1.  RLTA form with Lot
 the priority barangay   FORM
 6   2.  RLTA form with Lot   Number and Survey   NA              10 days
 Number and Survey   Actor   Claimant and Status
 (Excel file and/or printout)
 Claimant and Status   DENR, LGU-LMO











                                                                                  24
   21   22   23   24   25   26   27   28   29   30   31