Page 25 - Property Rights in the Philippine A Time and Cost Study_July 2017
P. 25
PREPARATION OF
CONSOLIDATED
CADASTRAL MAP AND
LAND CLASSIFICATION
MAP
Actor
4 Barangay Lot Status Head of the Mapping Division CCM and LCM for the priority NA 20 days
(Regional Office) barangay
Activity
Prepares the Consolidated
Cadastral Map (CCM) and Land
Classification Map (LCM)
PREPARATION OF RAPID
LAND TENURE
APPRAISAL
Actor
1. Barangay Lot Status CENRO DPLI RLTA form with Lot Number
5 2. CCM and LCM for and Survey Claimant and NA 30 days
the priority barangay Activity Status (Excel file and/or
printout)
Prepares the Rapid Land
Tenure Appraisal Form (RLTA).
Fills up Lot Number and Survey
Claimant data on the form
1. CCM and LCM for FILLING UP OF RLTA 1. RLTA form with Lot
the priority barangay FORM
6 2. RLTA form with Lot Number and Survey NA 10 days
Number and Survey Actor Claimant and Status
(Excel file and/or printout)
Claimant and Status DENR, LGU-LMO
24