Page 10 - TECHNICAL SPECIFICATION FOR PALM OIL REFINING_rev.1 - Copy_Float
P. 10
OFFER NO. KMIPL/P16E0097R7
100 TPD PHYSICAL REFINERY AND FRACTIONATION
Page No. 10/69
Item Qty Description
ECS303 One Earth Conveying System
Duty: To convey Bleaching earth from storage to
earth hopper.
Design: Pneumatic conveying system with Pipeline,
Cyclone, Blower, Dust collecting system
Construction: Carbon steel.
BH 322 One Earth Hopper
Duty: To store bleaching earth
Design: Slopped bottom tank.
Construction: Carbon steel.
TD303 One Earth Dosing System
Duty: To proportionally feed bleaching earth to the
bleacher.
Design: timer operated actuated valve system
Construction: Carbon steel.
B322 One Continuous Bleacher
Duty: Providing retention time for bleaching.
Design: Vacuum vessel with dished heads, multiple
compartments with agitator and agitator drive,
sight glass and man way.
Construction: Stainless steel 304