Page 22 - TECHNICAL SPECIFICATION FOR PALM OIL REFINING_rev.1 - Copy_Float
P. 22

OFFER NO. KMIPL/P16E0097R7
                                                      100 TPD PHYSICAL REFINERY AND FRACTIONATION
                                                                                              Page No. 22/69

               Item         Qty          Description


                                         The MCC is Front access with cable entry for mains power

                                         and control via the bottom of the panels. The MCC has an
                                         ingress protection rating of IP54 and can only be installed

                                         in a designated safe area. Ideally the MCC should be

                                         located in a clean environment away from dusty and wet
                                         atmospheres.


                                         The MCC comprises:-
                                         •    Main Incomer for isolation

                                         •    Distribution Busbar System

                                         •    Mains Power Monitor

                                         •    Motor Control Equipment suitable for various
                                         methods of starting.

                                            Eg. Direct On Line (DOL)

                                            Star Delta (Y/Δ)
                                            Variable Speed Drives (VSD) for Speed Control

                                         •    Remote Input and Output cards for communication to

                                         the PLC Panel
                                         •    Motor Protection Circuit Breakers

                                         •    Power Supplies for Internal use

                                         •    Interposing  / Control Relays
                                         •    Cooling Fans / Filters

                                         •    Power and Control Terminals for field wiring


                                         The MCC is linked to the main PLC panel via cabling.
   17   18   19   20   21   22   23   24   25   26   27