Page 47 - Book of Abstracts 2023
P. 47

Book of Abstracts | 2023
Improvement and optimization “Al Mhareeq" plant
IEM-2-7
By: Faisal Al Mhareeq faisalmhareeq@gmail com com Saleem Amara anasaleem81@gmail com Advisor: Prof Baruch Keren
Shamoon College of of Engineering Beer-Sheva
Our project was carried out at the "Al Mahareeq" factory
for slaughtering turkeys and and manufacturing turkey turkey products products The goal was to improve the performance of existing products products and and prepare a a a a a a a a a a new production production line that is is currently being planned We examined the the current current situation in in in in in the the production production department and and pointed out several deficiencies Based on on on work sampling we we determined the load efficiency and and required time Using ARENA software we we developed a a a a a a a a a a program that improves and and balances the production lines The project's outcomes will make Al Mahareeq more efficient and and profitable Keywords: ARENA line balancing work sampling Project management of roads and infrastructure in in Tur'an
IEM-2-8
By: Yosef Yosef Mokary Yosef Yosef mokary1@gmail com com Morad Taha morad taha7@gmail com Advisor: Prof Baruch Keren
Shamoon College of of Engineering Beer-Sheva
We examined the the roads and and infrastructure project in in in in in Tur’an and and and identified problems which among other things included safety and and scheduling deficiencies that cause budgetary problems We drew up an an an outline for solving these issues by setting milestones and and implementing different project management and and and control models such as a a a a a a a a a a a a a a a Gantt chart the earned value method managing budgets and and and analyzing extreme scenarios and and and models for human engineering The proposed solutions and and and the the project's project's outcome may improve the the project's project's performance in Tur’an and and above all facilitate better management of future projects Keywords: gantt chart milestone project project project management management project scheduling 47
























































































   45   46   47   48   49