Streamlining and improving the packaging packaging process at Kamada’s packaging packaging departments
IEM-3-3
By: Aviho Atias aviho5894@gmail com com Ari Stein ari26886@gmail com Advisor: Prof Yossi Hadad Shamoon College of of Engineering Beer-Sheva
We investigated the the the the current situation in in in the the the the packaging department of the the the the "Kamada" factory and identified their deficiencies We determined workload worker efficiency and and the time allotted for one product regarding its manual packaging packaging and and and machine packaging packaging via work sampling According to to the the Economic Order Quantity (EOQ) model and and and the the forecasted demand we proposed an an an an an an appropriate inventory policy We also performed quality control and and and defect defect analysis and and generated the the distribution of the the defects by type Keywords: economic order quantity (EOQ) forecasting inventory management quality control work sampling Improving and streamlining the the production process at the the Hashkel Factory Ltd
IEM-3-4
By: Aseel Abu Abu Eesa aseelab@ac sce ac ac il il Mais Abu Abu Samra abusamramais8 5@gmail com Advisor: Prof Yossi Hadad Shamoon College of of Engineering Beer-Sheva
We examined the the current situation at at the the "Hashkel" factory and and and identified its deficiencies Based on
on
work sampling we determined the the load efficiency and and and and standard time According to the the the economic order order quantity quantity (EOQ) model and and and and and Lagrange multipliers and and and and the the forecasted demand order order quantity quantity cost cost and and and carrying cost cost per per unit per per year we proposed an an an an an optimal inventory policy that that would result in in in in in savings of NIS 10 474 25 per per year In addition according to to the the the quality control that that we we performed we we determined the the the rate and distribution of of the the the types of defects Keywords: forecasts lagrange multipliers quality control work sampling 49