Improving and streamlining delivery time at “Biosense”
IEM-3-7
By: Raz Raz Melamed Razmelamed5@gmail com com Kesem Buchnik kesembuchnik@gmail com com Advisor: Dr Elroi Hadad 1Shamoon College of Engineering Beer-Sheva
Beer-Sheva
2“Filtuna” Factory Beer-Sheva
Beer-Sheva
For this project we inspected the current streamline of “Biosense”
We found issues in in in in in delivery time for CARTO products that created a a a a a a a a a significant delay in in in providing items to to customers abroad We analyzed the the product’s delivery durations using the the PARETO analysis system and and found two issues: poor supply planning and and faulty inventory inventory We suggested an an an an inventory inventory policy solution solution for for for forecasting order costs and and a a a a a a a a a a a quality control solution solution for for for for for faulty-product rate determination For forecasting demand for for for for the main items we offered applicable solutions The solution solution for for for stock availability and faulty inventory was defined by the simulation results Keywords: forecasts inventory management PARETO Analysis quality control Project management of "Hod Hasharon Tower"
IEM-3-8
By: Muhammed Muhammed Dahoud Mhameed dahodaraj@gmail com com Muhammed Muhammed Abu Zakika mody21348@gmail com com Advisor: Prof Baruch Keren
Shamoon College of of Engineering Beer-Sheva
Our project project project aimed to investigate a a a a a a a a a a a a a construction project project project review the the schedule and and and use of of resources and and and and estimate deviations in in time and and and and budget budget An updated updated budget budget was was was prepared as as as as as part of of the the project project project and and and and and and an an an an an an an an an economic feasibility study was was was conducted In addition an an an an an an an an an updated updated schedule was was was drawn up up up and and and and and actions were taken to to reduce the the deviations increase productivity and and and and and apply management and and and and and decision-making techniques to to to optimize the the the the project project We also performed high-frequency cost and and and and time control control analyses to to identify gaps at the the the earliest stage of the the the project project project Keywords: budget control control construction projects management decision making earned value gantt chart Pareto model 51